My work
full interior (walls + ceilings)
This mountain home got some serious love. All of the walls were previously painted yellow, had dings and holes, exposed framing in the kitchen and a textured bathroom. I hung and finished the drywall to create the pantry area, skim coated the bathroom and repaired all the drywall damage throughout. Everything was primed and painted with two coats of “Mayonnaise” using Benjamin Moore Select in Eggshell on the walls and ceilings.
full interior (walls + ceilings)
Minor drywall repairs were needed and walls were cleaned, spot primed and sanded before painting.
bathroom remodel
Still one of my favorite projects to date, this bathroom was outdated with heavily textured walls and vinyl flooring. Everything went but the tub, toilet and vanity. I insulted 3 walls, hung all new drywall, tiled the tub surround and floor, installed a recessed medicine cabinet and tiled a custom recessed towel nook to match the shower niche. After priming and painting, I installed the beadboard, towel hooks and sink fixtures.
Before (during) + Afters
Single room- previously stenciled design
This was one room out of a full interior I did. It had a previously stenciled dark pattern that needed to be sanded and primed before painting. All pin holes and larger were filled, walls & ceiling primed (walls twice) and got two coats of Sherwin Williams Cashmere. These photos were taken at the end of the day after sweeping and cleaning up. Floor protection used during all steps.